Reading the Warksburn: measuring water to restore it
A feasibility study in the upper Warksburn catchment, installing monitoring that shows how water, sediment and temperature behave, so restoration decisions rest on evidence.
LOCATION
Upper Warksburn, North Tyne
STUDY AREA
2,155 ha
MAIN WATERCOURSE
8.8 km, source to Stonehaugh
PHASE 1
PHASE 1
March 2026 – February 2027

Why the Warksburn
The Warksburn is a key tributary of the North Tyne, a river designated for Freshwater Pearl Mussel (Margaritifera margaritifera) conservation. Restoring the burn is part of the ecological recovery of the wider North Tyne system.
The water body, “Warks Burn from Source to Middle Burn”, was classed as Moderate status in 2019. It is not designated artificial or heavily modified, but its natural hydrology has been substantially altered by historic forestry operations and agricultural drainage.
Before restoring the catchment, we need to understand it. This project builds the monitoring network that will show how land use, woodland management and peatland condition affect flow, sediment and water quality at sub-catchment scale.
What we’re aiming to achieve
The work follows CaBA and Natural Flood Management principles, combining ecology, hydrology and landowner priorities. The project gathers the information needed to decide how to restore the natural functioning of the Warksburn, by:
Re-establishing natural flow pathways and slowing the flow to reduce the impact of extreme events
Restoring the “sponge effect” of peatland so it holds more water
Letting water spread into flood expansion zones during peak rainfall
Cutting fine sediment inputs with riparian buffers, sediment traps and woodland corridors
Increasing river shading and thermal resilience for brown trout (Salmo trutta) and Freshwater Pearl Mussel
Four strands of work
Hydrological regime
Flow, rainfall and soil moisture monitoring to measure baseflow, peak flow and flashiness, compared with Environment Agency data from Coalburn.
Sediment sources
Field surveys and GIS mapping of erosion hotspots such as gullies, drains, poaching and forestry scars, informed by landowners’ knowledge.
Intervention feasibility
Assessing where sediment traps, swales, riparian buffers and leaky barriers could work, and the best peatland and woodland opportunities.
Riparian woodland and temperature
Temperature loggers and light sensors to test modelling that suggests shading effects fade beyond 3 m from the river margin.
A new flow station will be installed just upstream of the Warksburn–Middleburn confluence, so the response of the two tributaries can be told apart. A rain gauge and weather station in the upper valley will capture the weather driving them, and a network of TinyTag loggers will record water temperature along the burn.
Project Timeline
What the project will deliver
Outputs include a hydrological baseline report, sediment hotspot maps, a feasibility options matrix with indicative costs, a woodland creation study and a record of stakeholder engagement.
| Deliverable | Due |
| Monitoring programme initiation package. Land access, procurement log and asset register, baseline field survey and integrated baseline dataset. | 31 Aug 2026 |
| Monitoring network commissioned and first data download. Calibrated, quality-assured network with a QA plan and first validated dataset. | 31 Aug 2026 |
| Interim analysis brief. Flow regime and flashiness metrics, initial sediment dynamics review. | 30 Nov 2026 |
| Catchment opportunities and stakeholder engagement summary. Sediment hotspot maps, feasibility shortlist and engagement log. | 31 Oct 2026 |
| Final report. Integrated findings, methodology and limitations, and a ranked options matrix. | 31 Mar 2027 |
Who benefits
- Supports the Natural World Fund’s aim of informed decisions in restoring degraded ecosystems, reducing sediment pressure and building climate-resilient habitats.
- Provides evidence for natural flood management planning for properties at, or projected to be at, risk of flooding along the Warksburn.
- Supports the Forest Research Catchment Laboratories initiative and the emerging Woodland Water Code.
- Helps Forestry England meet UK Forestry Standard compliance and supports Freshwater Pearl Mussel recovery in the North Tyne.
- Offers a replicable framework for integrated monitoring and NFM design across Northumberland and beyond.
Results will inform Phase 2 design and modelling and future funding bids, for example Landscape Recovery.
Funding and partners
This project is funded by Northumbrian Water through its Living Water programme.

Additional support: water temperature monitoring is funded by the Reece Foundation. Expert advice is contributed in kind by a soil scientist advisor, a Forest Research senior hydrologist and a James Hutton Institute senior scientist.